Custom capability

Custom Capability, Tooling and Quoting

Lead timeReady-made models 5–10 working days · Samples 7–15 days · Production 15–25 days after sample approval

Check your date →

What We Offer for Custom Projects

Quotation before commitment. Send us a drawing, a sample or the device itself. We review manufacturability before cutting steel, quote tooling and unit price as separate line items, and make non-standard parts to your drawing.

Manufacturability review before tooling. We check the design for mouldability, wall thickness, undercuts and ejection before steel is cut, reducing the risk of late modification and re-tooling delays.

Line-item quotation. Tooling and unit price are quoted as separate line items. There are no hidden charges bundled into the unit price.

Non-standard parts. Completely non-standard parts made from your drawing or sample are accepted; non-standard parts are quoted on the drawing.

Small trial orders. Small trial orders are accepted through our partner network; the MOQ is 500 pieces per design for custom tooling and 50 pieces per model for existing catalogue cases.

Tooling Charges

Custom sizes carry a one-off tooling charge, quoted separately as NRE (non-recurring engineering). Tooling cost can be amortized into the unit price over an agreed quantity, after which the unit price is adjusted accordingly. Once the NRE is paid in full, the tooling is reserved exclusively for this customer's parts and is not used for any other buyer's product.

Minimum Order Quantity and Lead Time

  • MOQ for existing models: 50 pieces per model (colours mixable within a model); mixed-model trial orders from 100 pieces. Existing models are made to order.
  • MOQ for custom parts: 500 pieces per design (the level at which tooling cost amortises into unit price).
  • Lead time, existing models: 5–10 working days after payment and confirmation of colour and quantity.
  • Sample lead time: 7–15 days for samples on existing tooling; 15–25 days for a first sample on new tooling.
  • Production lead time: 15–25 days after sample approval; repeat orders 15–20 days.
  • Tooling lead time: 10–20 days for simple tools, 20–40 days for complex tools.

Lead times start on receipt of deposit and drawing or colour confirmation, and exclude Chinese public holidays; add 2–4 weeks around Chinese New Year. All figures are confirmed in your quotation based on the part, material and quantity.

Process Overview

  1. Send drawing, sample or device.
  2. Manufacturability review and line-item quotation (NRE tooling + unit price).
  3. Sample approval.
  4. Production under follow-up and inspection.
  5. Shipment with documentation in our own name.

FAQ

How much does tooling cost, and how long does it take?

Tooling is quoted as a one-off NRE line item after the manufacturability review; the cost is project-specific. Tooling takes 10–20 days for simple tools and 20–40 days for complex tools, confirmed in your quotation.

Can tooling cost be amortized into unit price?

Yes. Tooling cost can be amortized into the unit price over an agreed quantity, after which the unit price is adjusted accordingly.

What is the MOQ for existing and custom parts?

MOQ is 50 pieces per model for existing cases (made to order) and 500 pieces per design for custom tooled parts; small trial orders are welcome and figures are confirmed with your quote.

What lead times apply to samples and production?

Existing models ship 5–10 working days after payment and colour confirmation. Sample lead time is 7–15 days on existing tooling and 15–25 days for a first sample on new tooling; production is 15–25 days after sample approval, repeat orders 15–20 days. Lead times start on receipt of deposit and drawing or colour confirmation and exclude Chinese public holidays.

Do you review the design before cutting steel?

Yes. We review manufacturability before tooling to reduce modification risk, and quote tooling and unit price as separate line items.

---

Send a drawing, a sample or the device model

We reply with a line-item quotation — tooling (NRE) and unit price quoted separately — within one business day.

Request a quote